Fishing Waist Pack-WBS22

The pack that masters elements and elevates journeys,
to free your hands and enjoy fishing.

• Size: 13.7″ x 11.6″ x 17.9″
• Color: Orange
• Capacity: 10L
• Material: 840D/TPU
Fishing Waist Pack

Fishing Waist Pack-WBS22

The pack that masters elements and elevates journeys,
to free your hands and enjoy fishing.

• Size: 13.7″ x 11.6″ x 17.9″
• Color: Orange
• Capacity: 10L
• Material: 840D/TPU

100% Quality Assurance

Free Design & Samples

100% Customization

Start MOQ 500pcs

Unmatched Protection Meets Sustainable Adventure, Adventure with Ease

Crafted from 840D high-strength nylon and eco-friendly TPU coating,
effectively resisting external scratches and punctures to ensure the safety of your belongings.
Unique airtight waterproof zipper design allows it to float on water even when fully loaded, safeguarding your valuables in all weather conditions.

Unmatched Protection Meets Sustainable Adventure, Adventure with Ease

Crafted from 840D high-strength nylon and eco-friendly TPU coating,
effectively resisting external scratches and punctures to ensure the safety of your belongings.
Unique airtight waterproof zipper design allows it to float on water even when fully loaded, safeguarding your valuables in all weather conditions.

Versatile Use: Transformative Waist Pack to Shoulder/chest Bag

wbs22_details_02_line

This waist pack is not limited to being worn around the waist; equipped with an adjustable shoulder strap,
it easily converts into a single shoulder bag or chest bag, catering to various outdoor activities such as canoeing,
jet skiing, fishing, boating, and beach leisure. Suitable for both men and women, it combines fashion with functionality.

Versatile Use: Transformative Waist Pack to Shoulder/chest Bag

wbs22_details_02_line

This waist pack is not limited to being worn around the waist; equipped with an adjustable shoulder strap,
it easily converts into a single shoulder bag or chest bag, catering to various outdoor activities such as canoeing, jet skiing, fishing, boating, and beach leisure. Suitable for both men and women, it combines fashion with functionality.

Compact Design, Easy Storage

With a compact size of 9.4″ x 3.5″ x 15.7″ and a 10L capacity,
it offers ample space without adding extra bulk.
The webbing D-shape-ring detail allows for easy attachment of keychains and small tools, enhancing accessibility and efficiency.

Optimized Comfort for Fishing and Extended Adventures

The carrying system integrates ergonomic principles,
with padded back panels and breathable mesh surfaces reducing discomfort during extended wear, ensuring freedom and comfort while fly-fishing or engaging in water sports.

Product Parameters

The perfect companion for outdoor activities
Lunch/fishing/picnic/park/hiking/camping/cycling

Product Parameters

The perfect companion for outdoor activities Lunch/fishing/picnic/park/ hiking/camping/cycling

Request A Quote

Contact us to start customization

Get Free Quote

Contact us to start customization

Get Free Quote

Contact us to start customization

Get Free Quote

Contact us to start customization

Get Free Quote

Contact us to start customization

Get Free Quote

Contact us to start customization

Get Free Quote

Contact us to start customization

Get Free Quote

Contact us to start customization