Warning: Constant WP_CACHE already defined in /www/wwwroot/weierkenbag.com/wp-config.php on line 8 IPX7 Waterproof Outdoor Bag | Resin-Sealed Zipper Leakproof跳到内容
Crafted from 1680D nylon with a TPU coating, this backpack is made to withstand the harshest outdoor conditions with exceptional puncture and tear resistance. Easy-to-Clean: Waterproof material enables you to use a soap and cloth to keep it looking new.
IPX7 Waterproof Rating
Our backpack features a 100% waterproof fabric complemented by a resin-sealed zipper, ensuring that water stays out while items stay dry. The included air valve allows you to inflate the pack for buoyancy, making it an essential companion for water-based.
Spacious 36L Capacity
With a generous 36-liter capacity, this backpack is designed to accommodate a wide range of outdoor gear, catering to the needs of a 3-7 days adventure. The side straps are perfect for securing blankets or pads, ensuring you have everything you need for a comfortable outdoor experience.
Convenient Waterproof Zippered Pocket
Access your essentials with ease through the waterproof side pocket with zipper. The pocket is designed to keep your phone, power bank, keys, and other small items dry and within reach.
Versatile for All Outdoor Pursuits
Ideal for a variety of outdoor activities, from water sports to hiking, snowmobiling, fishing, and boating, this backpack is your go-to for any adventure. The detachable sponge-lined inner bag provides extra protection for your electronic devices and other valuables against impacts.
Diverse Selection, Fashion & Convenience Merge
Suit your diverse needs with our range of backpacks, chest packs, and crossbody bags. Whether you’re seeking casual everyday utility, weekend outdoor adventures, or a reliable business travel companion, you can find your ideal choice in the same series.
Product Parameters
The perfect companion for outdoor activities Lunch/fishing/beach picnic/ barbecue/park/hiking/camping/cycling