Versatile Convertible Bag-WBS25

Embark on every thrilling journey with this waterproof backpack that masterfully combines protection, practicality, and style.

• Size: 15.0″ x 9.1″ x 20.9″
• Color: Orange
• Capacity: 10L
• Material: 840D/TPU

Versatile Convertible Bag-WBS25

Embark on every thrilling journey with this waterproof backpack that masterfully combines protection, practicality, and style.

• Size: 15.0″ x 9.1″ x 20.9″
• Color: Orange
• Capacity: 10L
• Material: 840D/TPU

100% Quality Assurance

Free Design & Samples

100% Customization

Start MOQ 500pcs

Fortress of Protection: Elastic Defense for Your Valuables

wbs22_details_02_line

Crafted from premium 840D/TPU materials and seamless thermal bonding technology,it creates an impenetrable fortress against water. The exceptional elasticity of TPU ensures comprehensive safeguarding for your valuables while its wear-resistant and tear-proof qualities stand up to the toughest outdoor challenges.

Fortress of Protection: Elastic Defense for Your Valuables

wbs22_details_02_line

Crafted from premium 840D/TPU materials and seamless thermal bonding technology,it creates an impenetrable fortress against water. The exceptional elasticity of TPU ensures comprehensive safeguarding for your valuables while its wear-resistant and tear-proof qualities stand up to the toughest outdoor challenges.

Fortress of Protection: Elastic Defense for Your Valuables

Crafted from premium 840D/TPU materials and seamless thermal bonding technology,it creates an impenetrable fortress against water. The exceptional elasticity of TPU ensures comprehensive safeguarding for your valuables while its wear-resistant and tear-proof qualities stand up to the toughest outdoor challenges.

Eco-Friendly Fabrics with IPX7 Waterproofing

Equipped with a high-quality airtight zipper and 840D TPU eco-coating, it not only achieves IPX7 waterproof rating, guaranteeing your belongings remain dry and secure in any wet condition, but also simplifies daily maintenance, retaining its freshness with a simple wipe.

Convertible Tote-to-Backpack with Customizable Comfort & Effortless Handling

With 40L capacity, this versatile bag switches between tote and backpack modes. Its design blends tote convenience with backpack comfort, featuring adjustable, detachable shoulder pads for customized carry options. Enhanced handles and adaptable straps make every journey effortless.

All-in-One Bag, Versatile Outdoor Companion

From city commutes and beach getaways to camping trips, surfing, kayaking expeditions, motorcycle rides, or tranquil fishing days, its the indispensable companion for diverse outdoor scenarios.

All-in-One Bag, Versatile Outdoor Companion

From city commutes and beach getaways to camping trips, surfing, kayaking expeditions, motorcycle rides, or tranquil fishing days, its the indispensable companion for diverse outdoor scenarios.

Product Parameters

The perfect companion for outdoor activities
Lunch/fishing/picnic/park/hiking/camping/cycling

Product Parameters

The perfect companion for outdoor activities Lunch/fishing/picnic/park/ hiking/camping/cycling

Request A Quote

Contact us to start customization

Get Free Quote

Contact us to start customization

Get Free Quote

Contact us to start customization

Get Free Quote

Contact us to start customization

Get Free Quote

Contact us to start customization

Get Free Quote

Contact us to start customization

Get Free Quote

Contact us to start customization

Get Free Quote

Contact us to start customization